Testimonials

GRUPPO ENI

ITER

ROSETTI MARINO

POLIMERI EUROPA

FORES ENGINEERING

FRANZ ISELLA

PARCO DELLA STANDIANA

BONATTI

See other

Home   >  case study   >  Hospital

Realization refrigeration system Bufalini Hospital Cesena

Central cooling technical

  • The refrigeration system is designed to contain three chillers (centrifugal compressor)
  • Cooling unit power:  2800 kW each (total cooling capacity kW 2800 +2800 +2800 = 8400 kW).
  • Condensation: was carried out using open-circuit cooling towers.
  • Of all the work was carried out the construction project and the elaborate detail of the construction of individual pieces in the workshop before installation in the field.

Below are some photos and some drawings for the project.

Here, alongside the construction drawings issued for the construction of the collectors and pipes inside the refrigeration unit of the hospital.

Here, alongside some photos taken during the execution of works for the construction of the refrigeration unit of the hospital.

Intera realizzazione siti web CMS TYPO3 per aziende progettazione e realizzazione impianti di refrigerazione HVAC system