Air conditioning systems of HVAC modules and cabin accommodation

HVAC air conditioning systems at the service of modules housing, of control room cabin and battery rooms and at the service of local switcgear room, air conditioning systems sized for the offshore industry

impianto condizionamento HVAC

Scarabeo 3 Project: HVAC system with external pressurized air

  • Realization of HVAC air conditioning system serving of a housing module and a coffee shop serving the mobile platform Scarabeo 3.
  • The HVAC system was carried out using roof top and steel pipes for the transport of conditioned air.
  • HVAC systems have been completed with a pressurization system with external air.
impianto condizionamento HVACimpianto condizionamento HVAC2sistemi HVACimpianto pressurizzazione aria esterna

HVAC in the control room cabin and battery rooms on the platform Akal Development

Type of system: AHU + ACCU
Destination: Mexico

  • Realization of HVAC air conditioning serving to control room cabin and battery rooms to be installed inside the Akal platforms.
  • The plant has been built using custom built HVAC units for the project.
    All systems are manufactured according to ATEX.
  • HVAC systems have been completed with a pressurization system with External air.
impianto condizionamento HVACimpianto pressurizzazione aria esterna

HVAC systems with external air pressurization system on the platforms Ikalou North and South

Destinazione: Congo

    • Construction of an HVAC system serving the control rooms on platforms Ikalou North and South.
    • The HVAC system was created using a rooftop system, positioned on deck, and steel ducts to convey the conditioned air.
    • The HVAC systems were completed with an outdoor air pressurization system.


    impianto condizionamento HVAC

    HVAC in the equipment room and switcgear local on the platform Halfdan Platform

    Type of plant: AHU + ACCU
    Destination: North Sea – Denmark

    • Realization of HVAC air conditioning system serving the switchgear room and equipment room within the platform Halfdan.
    • HVAC systems have been completed with a pressurization system with external air.
    impianto condizionamento HVAC

    HVAC air conditioning system on the platform BD1 - 137B Field Development

    Type of plant: AHU + ACCU
    Destination: Libya

    • Realization of HVAC air conditioning system serving the BD1 platform.
    • HVAC systems have been completed with a pressurization system with external air